Posts

Showing posts from March, 2023

Modular Oil Refinery

Image
Catalog of Modular Floating Oil Refinery Mode Capacity Power Fabrication Period Area Skid Number Weight (BPD) (Kw/d) (month) (Acre) (Ton) MR10 1000 150 5 1 5 120 MR30 3000 200 5 2 7 160 MR50 5000 275 6 2 8 200 MR100 10000 350 6 3 11 375   EPC Scope of Work for Modular Oil Refinery EPC Scope of Work No. Item   By PCC By End-user 1 Feasibility Study Engineering   √ 2 Basic Design √   3 Detail Design √   4 Budgeted Deliverables √   5 local government approval and supervision   √ 6 Purchase Requisitions √   7 Parsed MTO Procurement √   8 Purchase Order √   9 Transportation & Logistics √   10 Release to Construction √   11 Contracts √   12 General Const.Plan Construction √   13 Civil work   √ 14 Piping √   15 System Turn-over √   16 Start-up & Commissioning √   17 Performance Run √   18 Turn-Over to end-user √     OSBL & ISBL Scope of Work       No. Item   By PCC By End-user 1 10000 BPD CDU+VDU Inside Battery Limits √   2 Tank Farm Outside Battery Limits   √ 3 Water Supply and