Posts

Showing posts from November, 2023

Training

Image
  PCC's advisory personnel will advise client's local technicians and operators with respect to, and will demonstrate basic fundamentals of, successful plant operations during the commissioning process. Such oil refinery training  will include the following:   Control Software R efinery T raining This training will take place in the China at a time and place to be determined jointly by the Parties.   On-the-Job Controls Training PCC will provide on-the-job service (“OTS”) training advice at the refinery site for client's personnel regarding the operation, maintenance and troubleshooting of local instrumentation (temperature, level, pressure, and flow) and remote control instrumentation.   On-the-Job Rotating Equipment Training PCC will provide OTS refinery training at the refinery site for client's personnel regarding the operation, maintenance and troubleshooting of rotating equipment (mechanically-sealed centrifugal pumps, seal-less centrifugal pumps, positive-displac

Commissioning & Start-up

Image
  P lant C ommissioning and S tartup PCC will supply personnel to advise with respect to equipment installation, commissioning and initial startup.   Commissioning includes inspecting all process, mechanical, instrumentation and electrical components to confirm readiness for startup. Startup includes slowly feeding crude oil into the process equipment and heating/ramping up flow until maximum capacity is reached and all adjustments for correct operation are finished. A test run of the refinery unit is then performed to confirm achievement of the equipment requirements. Client will be responsible for all labor, consumables and operations/maintenance costs during startup and during regular operation.   Modular Refineries and gas processing units require a minimum amount of operating personnel since their automatic operation can be monitored and controlled remotely through a SCADA system and the operators digitally alerted of any alarms.   The unit allows a single operator to restart the

Modular HCL Tail Gas Scrubber

Image
  Project Name 45000m3/h HCL tail gas scrubber 25000m3/h HCL tail gas scrubber Location Daman, Saudi Arabia Time November, 2014 Client Steel wire rope manufacturer Scope of work EPC PCC provides EPC service, including process engineering design, pipe match, equipment design & manufacture, electrical appliance & meter installation, site installation guidance, commissioning and startup, training etc. Description The client provided the tail gas component and the local emission requirements. The discharge tail gas content is much lower than local emission standard This project was delivered within 45 days, finished installation and commissioning in 5 days. Evaluation The plant is running stably since started in November, 2014. The client is very satisfied, and develop long term cooperation with PCC.   If you want to know more details of oil refinery engineering , please visit our website.  

Modular Acetone Solvent Recovery Plant

Image
  Specification solvent recovery plant design Project Name Modular Acetone Solvent Recovery Plant Location Jinan, China Time November 2015 Client Pharmaceutical company Codes & standard ASME Scope of work EPC PCC provides EPC service, including process refinery engineering  design, pipe match, equipment design & manufacture, electrical appliance & meter installation, site installation guidance, commissioning and startup, training etc. Description The owner is the largest pharmaceutical intermediates Cephems in China. The feed is acetone mixed gas. The client requested that the yield is 95%, the purity is above 90%, the tail gas VOC is below 80PPM (mg/m3). The purity of our experiment and process can reach 97%. Other data can meet the requirements of the client. Evaluation The plant is running successfully and stably since started in November 2015. The client is very satisfied, and develop long term cooperation with PCC.