Modular HCL Tail Gas Scrubber
Project Name | 45000m3/h HCL scrubber 25000m3/h HCL tail gas scrubber |
Location | Daman, Saudi Arabia |
Time | November, 2014 |
Client | Steel wire rope manufacturer |
Scope of work | EPC PCC provides EPC service, including process engineering design, pipe match, equipment design |
Description | The client provided the tail gas component and the local emission requirements. The discharge tail |
Evaluation | The plant is running stably since started in November, 2014. The client is very satisfied, and develop |
Comments
Post a Comment