Modular HCL Tail Gas Scrubber
Project Name | 45000m3/h HCL tail gas scrubber |
25000m3/h HCL scrubber | |
Location | Daman, Saudi Arabia |
Time | November, 2014 |
Client | Steel wire rope manufacturer |
Scope of work | EPC |
PCC China provides EPC service, including process engineering design, pipe match, equipment design | |
& manufacture, electrical appliance & meter installation, site installation guidance, commissioning | |
and startup, training etc. | |
Description | The client provided the tail gas component and the local emission requirements. The discharge tail |
gas content is much lower than local emission standard This project was delivered within 45 days, | |
finished installation and commissioning in 5 days. | |
Evaluation | The plant is running stably since started in November, 2014. The client is very satisfied, and develop |
long term cooperation with PCC. |
Comments
Post a Comment