Modular HCL Tail Gas Scrubber

 

Project Name

45000m3/h HCL tail gas scrubber

25000m3/h HCL tail gas scrubber

Location

Daman, Saudi Arabia

Time

November, 2014

Client

Steel wire rope manufacturer

Scope of work

EPC

PCC provides EPC service, including process oil refinery engineering design, pipe match, equipment design

& manufacture, electrical appliance & meter installation, site installation guidance, commissioning

and startup, training etc.

Description

The client provided the tail gas component and the local emission requirements. The discharge tail

gas content is much lower than local emission standard This project was delivered within 45 days,

finished installation and commissioning in 5 days.

Evaluation

The plant is running stably since started in November, 2014. The client is very satisfied, and develop

long term cooperation with PCC.

 

 


Comments

Popular posts from this blog

China Huaxin shares Russian oil company and sign oil purchase agreement

Processing Units Of Oil Refinery

Isomerization Unit