Mini Oil Refinery
Catalog of Mini oil refinery design
Mode | Capacity (BPD) | Power (Kw/d) | Fabrication Period (month) | Area (Acre) | Skid Number | Weight (Ton) |
MR2 | 200 | 75 | 4 | 1 | 4 | 50 |
MR5 | 500 | 100 | 4 | 1 | 4 | 80 |
A gas plant will also be needed to capture and separate the gas products from the CDU but was not sized, nor priced. Upon completion of the process design, the size and cost of the gas plant will be determined. Air Cooling is used in lieu of water cooling. Heat transfer oil and hot products are used in lieu of steam for reboiling and stripping. If client requests the use of cooling water and steam, the daily requirement will be provided with Schedule A process engineering design. Any changes by Client to feedstock and/or product slate will require the generation of a new technical proposal based upon updated feedstock or product slate. An actual feedstock assay will be required prior to commencement of construction.
Scope of Supply of mobile oil refinery The Process Design Package shall consist of the process equipment that will include preliminary and final engineering/design; a petroleum oil refinery with necessary equipment; one-year supply of spare parts and a documentation package that can be used to apply for permits and for operations.
For more information about oil refinery engineering and mini crude price , please feel free to contact us!
Comments
Post a Comment